Type of Building: Pre-engineered steel building.
Building Length: 100 feet Building Width: 60 feet
Contract Value: $745,000.00 Construction time: 180 Days
Notable Features: 6000 Sq. foot clear span hipped metal building
with split faced block and brick veneer. This facility houses two
state of the art 3D simulators for law
enforcement training
POC- Upon Request
US Army, Building 2311, Fort Hood, Texas
|
U.S. ARMY ~ Fort Hood, Texas
|
US Army Building 4431, Fort Hood, Texas
|
Type of Building: Masonry, CMU Block Building Size: 2 Buildings
approximately 23,000 Sq. Ft. each
Contract Value: $2,831,000.00
Construction Time:180 Days Notable Features: The project consisted of complete
demolition of all interior and exterior fixtures, as well as a complete upgrade to modern
technical standards. A second floor was installed to accommodate administrative
functions. All sub-standard equipment to include electrical, HVAC, data
communications,exhaust systems, and plumbing were removed and replaced. POC- Upon
Request
US Army Motorpool Renovation, Fort Hood, Texas
|
Type of Building: Pre-engineered steel building.
Building Length: 100 feet Building Width: 50 feet
Contract Value: $792,000.00 Construction time: 250 Days
Notable Features: This building was completely redesigned 60 days
into construction POC- Upon Request
US Army Building 56504 / 56505, North Fort Hood, Texas
|
Type of Buildings: Pre-engineered
steel building.
Building Lengths: 100 feet Building
Widths: 60 feet / 50 feet
Contract Value: $745,000.00 /
$740,000.00 Construction time: 205
Days
Notable Features: 5000 / 6000 Sq.
foot clear span hipped metal building
with split faced block and EFIS
veneer. These facilities are being
constructed during the winter months
with no extensions requested. These
buildings and buildings 56488 /56489
are being constructed simultaneously.
Projects are ahead of schedule and
in budget
POC- Upon Request
US Army Building 56488 / 56489, North Fort Hood, Texas
|
Type of Buildings: Pre-engineered steel building.
Building Lengths: 114 feet Building Widths: 75 feet
Contract Value: $745,000.00 / $750,000.00 Construction time:
205 Days
Notable Features: 8,550 Sq. foot clear span gable metal building
with 16 ft eave height and 14 ft. overhead doors. Buildings have
complete HVAC, plumbing, and command offices. These
facilities are being constructed during the winter months with no
extensions requested. Projects are ahead of schedule and in
budget
POC- Upon Request
US Army Building 90041 Renovation, West Fort Hood, Texas
|
Type of Project: Building Upgrade and Renovation
Contract Value: $648,000.00 Construction Time: 120 Days
Notable Features:
The work consisted of demolition and remodel of an existing structure
with full tile, carpet bathroom, data comm, HVAC and electrical
replacement. We also installed a high tech, high security
communications system
POC- Upon Request
US Army RGAAF Airfield Canopy, West Fort Hood, Texas
|
Type of Project: Shade, Rain Canopy
Contract Value: $24,500.00 Construction Time: 30 Days
Notable Features: This project, although small, was very significant.
We were asked to construct a shade canopy to shelter families from
the elements as they await the arrival of their fallen heroes. We were
honored to do this project at cost and without profit.
POC- Upon Request